Well report No. RR-9878 · T10N · R43W · SEC 22 · filed November 7, 2026

OffshoreWell report

Vedanta sets multiwell exploration plan for KG deepwater block

Vedanta will drill multiple wells at the KG-DWHP-2017/1 deepwater block in early next year, with Exceed supporting planning and execution in the KG basin.

Field notes

  1. Vedanta plans a multiwell exploration campaign at KG-DWHP-2017/1 to start early next year.
  2. The block covers 4,616.85 sq m in 600–2,000 m of water and contains four existing gas discoveries.
  3. Vedanta operates the block with 100% interest; Exceed provides integrated campaign support.
  4. Vedanta is evaluating the Vermilion prospect as a distinct new play.
  5. The company recently secured two offshore KG basin blocks, including KG/DWDSF/GD10/2025.
Vedanta to explore off India’s east coast
PlateVedanta to explore off India’s east coast — MICHOFF / pixabay

Vedanta Oil & Gas Ltd. (VOGL) plans a multiwell exploration campaign early next year at the KG-DWHP-2017/1 deepwater block, in 600–2,000 m of water off India’s east coast. The Krishna-Godavari basin block covers 4,616.85 sq m and contains four existing gas discoveries.

Vedanta operates it with 100% interest and has entered a strategic partnership with Exceed to explore the asset. The phased program covers project planning, engineering, operational readiness and well execution.

What will the multiwell campaign test?

Vedanta expects its multiwell exploration drilling campaign to begin “early next year,” the company said. The announcement gives no firm start date, well count, rig assignment or drilling contractor, so “early” remains the only timing marker for now.

The company is evaluating the Vermilion prospect as “a distinct new play with potential,” it said. That wording identifies Vermilion as a target for exploration rather than a project with an approved development scheme.

Vedanta did not name the four existing gas discoveries, assign well locations to them or attach production estimates and startup dates to them in the disclosure. The multiwell program therefore remains an exploration effort, not a commitment to bring the discoveries or Vermilion into production.

The next step is testing, followed by separate decisions on what to develop.

What does Exceed’s role change?

Under the partnership, Exceed will provide integrated support across the campaign. Its remit covers subsurface evaluation, well planning, drilling readiness and operational management, linking geological work with the steps needed to execute the wells.

Vedanta remains operator with 100% interest, so the agreement does not dilute its ownership of DWHP-2017/1. The disclosure gives Exceed no stated equity interest, contract value or fee structure, and it names no rig or other well-services contractor.

For operators and service suppliers, the practical issue is the division of work between Exceed’s integrated support and the companies that will supply the rig and well services. Vedanta has assigned campaign support while keeping control of the block.

How do the four gas discoveries fit the plan?

The four existing gas discoveries sit alongside Vermilion in the company’s description, but Vedanta does not say whether the campaign will test all four, any subset or Vermilion alone. The first drilling phase has no attached production schedule, so the timing of any development remains undefined.

The company also does not link the drilling program to a production decision. A discovery does not by itself set a startup timetable, and the announcement provides no production volume or approval to develop the four finds.

Existing discoveries and a new drilling campaign remain two separate parts of the story.

What do the two new offshore blocks add?

Vedanta has recently secured two offshore blocks in the KG basin, including the deepwater block KG/DWDSF/GD10/2025. The additions broaden the company’s KG position alongside DWHP-2017/1, though the disclosure gives no acreage, water depth, partner split or work commitment for the new blocks.

The company did not pair the block acquisitions with a drilling schedule or identify the new prospects. Those details would set the pace of activity after the DWHP-2017/1 campaign, but the current announcement confines its operational promise to a multiwell program at the existing operated block.

The practical addition is more KG acreage, not a stated production forecast.

What should operators watch next?

Confirmation of the early-next-year start will be the first checkpoint. The well count, rig assignment and division of work between Exceed and contractors will determine how much of the supply chain the program engages. Results from the first wells would then guide further testing and development decisions.

No first-production date, production volume or margin estimate accompanies the announcement. Watch the firm drilling start and well count first; any production timetable must wait for results and a separate development decision.

via vedantaoilandgas.com (Original)

Filed under

  • vedanta
  • deepwater-drilling
  • krishna-godavari-basin
  • natural-gas-exploration
  • kg-dwhp-1
Share this article:

More from James Calloway

James Calloway

Show full bio

Staff writer covering people, launches and day-to-day practice in Oil and gas industry operations and markets at Rig & Refinery.

587 articles

Adjoining reports

« Previous articleNext article »