Well report No. RR-6771 · T1N · R14W · SEC 1 · filed October 15, 2026
Refining & PetrochemicalsWell report
America First Refining Targets Texas Refinery Start-Up in Three Years
America First Refining has set a three-year start-up target for a Texas refinery, Quantum Commodity Intelligence reports, with capacity, site and financing details still undisclosed.
Field notes
- America First Refining targets refinery start-up in Texas within three years.
- Reported by Quantum Commodity Intelligence; no capacity figure disclosed.
- Three-year timeline implies first production around 2028.
- No major grassroots US refinery has been built in decades.

America First Refining has set a three-year timeline for starting up a refinery in Texas, according to a report by Quantum Commodity Intelligence. The company's target puts first production at roughly the 2028 mark, assuming permitting and construction hold to schedule.
The plan arrives as US refining capacity remains a scarce commodity. No major grassroots refinery (a plant built from the ground up, rather than expanded) has entered service in the United States for decades, and the last large closures have tightened Gulf Coast supply. A three-year build window is aggressive by industry standards, where multi-year permitting alone often precedes construction.
What do we know so far?
The company has not yet disclosed the plant's designed crude throughput, expressed in barrels per day, or a specific site within Texas. Quantum Commodity Intelligence reports the start-up ambition but limited engineering and commercial detail has entered the public record to date. Key parameters remain open questions:
- Design capacity in bpd
- Final site selection and plot footprint
- Crude slate and feedstock sourcing
- Financing structure and capital estimate
- Air permitting status with Texas regulators
Three years from announcement to start-up would place the project among the fastest greenfield refinery executions ever attempted in the US Gulf Coast market.
Why does the timing matter?
Texas hosts the densest concentration of refining capacity in the country, anchored by the Houston Ship Channel and the Port Arthur complex. Any new entrant would compete against established operators with integrated logistics, petrochemical tie-ins and established product placement. New-build economics depend heavily on crack spreads (the margin between crude input cost and refined product prices), which analysts track as the decisive variable for project viability, not as settled fact.
Observers will also watch how the project navigates federal and state environmental review, historically the schedule risk that has defeated prior grassroots attempts.
What is the watch item?
The permit filings and an announced capacity figure. Until America First Refining publishes a bpd number, site control and a capital budget, the three-year start-up claim sits at the conceptual stage rather than the sanctioned-project stage, and Quantum's report should be read in that light.
via Google News: Refineries and petrochemicals (Source)
More from Olivia Hart
Show full bio
Correspondent covering technology and product news in Oil and gas industry operations and markets at Rig & Refinery.
489 articles
Adjoining reports
- Trump announces Texas refinery, calls it first US greenfield in 50 years
- $1.2 Billion Refinery Planned on South Texas Farmland
- Texas July 2026 oil and gas production data released
- US atmospheric distillation capacity to decline in 2026, EIA says
- Dallas Fed Survey: US Oil, Gas Output Up in Q3 as Price Doubts Weigh